This week, we have been absorbing some of the feedback given to us during our week in St.Stephen’s Green; part of Innovation Dublin. As a result of this, all of the projects are now being reviewed. Some are going back to their roots; while others are going to have to change significantly. It’s all a process of evolution.
The latter part of the week was spent preparing for prototyping and presenting the projects in Clongriffin. Prototypes were centered around validating the projects with Clongriffin residents; finding out what they think of them. Friday was the deadline for moving the Designing Dublin office to Clongriffin. It was a rush to the finish and there wasn’t much time to share what each group was prototyping. In the end we made it across the line around 6pm.
» Ken